A refrigeration plant has been prepared for opening up the system for non-major repairs by performing a system pumpdown and bringing the part of the system to be opened to 0 psig. At the completion of the repairs and after re- closing the system what is the recommended procedure?
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer