Engine : Refrigeration AC - 483/610 |
---|
« Previous Question |
Which of the installation steps listed is necessary for the proper operation of the thermostatic expansion valve? |
A) Remove excess lengths of the sensing bulb capillary tube from the device to increase sensitivity. |
B) Attach the thermal bulb to the suction line using plastic ties. |
C) Clean off oxidation from the surface of the suction line and sensing bulb with fine abrasive cloth or steel wool. |
D) Heat shrink insulating material around the device once the bulb has been properly secured. |
loading answer...
Comments |
---|
There are no comments for this question. |