When shore power is being connected to a ship in dry-dock, what must be ensured, assuming that the ship's generators are rated at 450 VAC, 60 Hz with a total plant generating capacity of 10000 kW?
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer