USCGQ
USCGQ
Toggle sidebar

Engine: Electricity

Question 1,437 of 1,595

No.1 SSDG was operating in parallel with No.2 SSDG in supplying the 480 VAC main bus while sharing the electrical load evenly. As a result of a problem, if No.1 SSDG begins to motorize, but the generator has not yet tripped out by the action of the reverse power relay, what would be the indication of this?

0 ✓ | 0 ✕ 10 free left today

Tip: press A-D to answer

Appears on the 2026 sample exam for

More Electricity questions