Your vessel is underway in periodically unmanned engine room condition. The No.2 SSDG is to be down for repairs for at least the next 24 hours. The vessel is nearing US navigable waters. As chief engineer, how would you ensure that the bridge is immediately informed once the No.2 SSDG is back online to support the electrical power requirements of maneuvering?
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer