USCGQ
USCGQ
Toggle sidebar

Deck 2014: Safety

Question 476 of 5,254

A vessel's tropical load line is 6 in. above her summer load line.  Her TPI is 127 tons.  She will arrive in the summer  zone 8 days after departure.  She will burn off about 47 tons/day fuel and water consumption is 12 tons/day.  How many tons may she load above her summer load line if she loads in the tropical zone?

0 ✓ | 0 ✕ 10 free left today

Tip: press A-D to answer

More Safety questions