A semisubmersible 300 feet long and an LCF of 0 (amidships) is in transit with hulls awash and an MT1" of 87.67 foot-tons. Work on the BOP (weight 263 long tons) requires that it be moved aft 12 feet. What is the resulting trim change?
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer