USCGQ
USCGQ
Toggle sidebar

Deck 2014: Safety

Question 2,432 of 5,254

The DEEP DRILLER is loaded as shown in the Sample Load Form #5 (Survival), when an unexpected, slowly increasing port list and bow down trim occurs.  A leak in C1P is found.  By deballasting from ballast tanks 2P and 3P, the inclination  slowly decreases.  The increase in the longitudinal free surface correction is __________ .

0 ✓ | 0 ✕ 10 free left today

Tip: press A-D to answer

More Safety questions