The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). If the drill water in drill water tanks #6 and #25 are discharged, what is the new draft?
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer