The COASTAL DRILLER is in transit loaded as shown in the Sample Load Form #1 (Rig Move). What would be the new KGT if, during the move, 170.9 kips of fuel oil is consumed from Diesel Oil Tanks #13 and #14?
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer