The DEEP DRILLER is loaded as shown in Sample Load Form #4, (Drilling). In preparing for approaching heavy weather, the four leeward mooring lines are slacked. These actions reduce the __________.
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer