The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the contents of the No.1 drill water tank are discharged, what would be the new LCG?
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer