The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the drill water in drill water tanks 6 and 25 are discharged, what is the new draft?
0 ✓
|
0 ✕
10 free left today
Tip: press A-D to answer