Log In


Deck : Deck General - 3420/5076
Get a hint
« Previous Question
The initial tension set in the mooring system of a MODU establishes the __________.
A) maximum time it will take to disconnect the riser package in the event of a storm
B) minimum amount of ballast needed to keep the vessel at operating draft during normal drilling operations
C) distance the unit can be offset from the wellbore before the restoring forces oppose the environmental forces
D) maximum water depth at which drilling operations can be conducted
loading answer...
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score