Deck : Deck General - 3420/5076 |
---|
« Previous Question |
The initial tension set in the mooring system of a MODU establishes the __________. |
A) maximum time it will take to disconnect the riser package in the event of a storm |
B) minimum amount of ballast needed to keep the vessel at operating draft during normal drilling operations |
C) distance the unit can be offset from the wellbore before the restoring forces oppose the environmental forces |
D) maximum water depth at which drilling operations can be conducted |
loading answer...
Comments |
---|
There are no comments for this question. |