Engine : Electricity - 54/1386 |
---|
« Previous Question |
In testing a three-phase delta-connected winding for an open circuit using a ohmmeter, what must be done? |
A) measure the voltage across the open connections while testing |
B) test the windings as parallel groups to avoid short circuiting |
C) if possible, open the delta-connections to avoid shunting the phase being tested |
D) test each phase with all connections intact |