
Engine : Expired / Motor Plants and Auxiliary Boilers - 873/354 |
---|
« Previous Question |
Which of the following is necessary for all waste heat boiler installations, regardless of design or manufacturer? |
A) Installation of a superheater |
B) An independent means to prevent feed water contamination |
C) Installation of a powered circulating booster pump |
D) A means to control of evaporation |
loading answer...
Comments |
---|
There are no comments for this question. |