Deck : Safety - 68/2841 |
---|
« Previous Question |
For GMDSS, when may a compulsory vessel not be allowed to leave port? |
A) When the vessel has replaced a required piece of GMDSS-related equipment but its performance has not been verified or logged |
B) When the vessel is in an overloaded condition |
C) When the vessel is carrying only two licensed GMDSS Radio Operators and is capable of performing all required functions |
D) When the vessel has arranged for both duplication of equipment AND shore-based maintenance |
loading answer...
Comments |
---|
There are no comments for this question. |