A vessel is loaded to her summer marks for a voyage from Montreal, Canada to Duluth, MN via the Great Lakes System. The voyage has been estimated to take nine (9) days. If the vessel departs Montreal on September 28th, which of the following statements is TRUE? |
A) The vessel must be at her winter marks by the evening of the third day. |
B) The vessel must be at her summer marks when she arrives at Duluth. |
C) The vessel is in violation of the load line requirements. |
D) The vessel's intermediate load line marks may not be submerged after September 30. |