Deck : Deck General - 5070/5076 |
---|
« Previous Question |
How much additional solid weight could be loaded at a VCG of 189.7 feet on the DEEP DRILLER while loaded as shown in the Sample Load Form #4 (Drilling)? Assume ballast added or discharged to maintain draft is done so at 15 feet above the baseline. |
A) 279.2 long tons |
B) 314.2 long tons |
C) 404.2 long tons |
D) 461.9 long tons |
loading answer...
Comments |
---|
There are no comments for this question. |