Deck : Deck General - 5067/5076 |
---|
« Previous Question |
If a severe storm threatens the COASTAL DRILLER while elevated as shown in the Sample Load Form #3 (Drilling), the variable loads would have to be reduced by __________. |
A) 3,282.5 kips |
B) 2,381.0 kips |
C) 1,000.0 kips |
D) 901.5 kips |
loading answer...
Comments |
---|
There are no comments for this question. |