Deck : Deck General - 4657/5076 |
---|
« Previous Question |
The DEEP DRILLER is loaded as shown in the Sample Load Form #5 (Survival), when an unexpected, slowly increasing port list and bow down trim occurs. A leak in C1P is found. By deballasting from ballast tanks 2P and 3P, the inclination slowly decreases. The increase in the longitudinal free surface correction is __________. |
A) 0.90 foot |
B) 0.83 foot |
C) 0.57 foot |
D) 0.49 foot |
loading answer...
Comments |
---|
There are no comments for this question. |