« Previous Question |
The DEEP DRILLER is loaded as shown in the Sample Load Form #5 (Survival) when an unexpected slowly increasing port list and bow down trim occurs. A leak in C1P is found. By deballasting from ballast tanks 2P and 3P, the inclination slowly decreases. The increase in the transverse free surface correction is __________. |
A) 1.25 feet |
B) 0.82 foot |
C) 0.34 foot |
D) 0.18 foot |