The DEEP DRILLER is loaded as shown in the Sample Load Form Number 5 (Survival) when an unexpected slowly increasing starboard list and bow down trim occurs. A leak in 1S is found. By deballasting from ballast tanks 2S and 3S, the inclination slowly decreases. The increase in the transverse free surface corrections is __________. |
A) 1.25 feet |
B) 0.90 foot |
C) 0.84 foot |
D) 0.22 foot |