Log In


Deck : Deck General - 4232/5076
Get a hint
« Previous Question
The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft?
A) 60 feet 9.6 inches
B) 59 feet 9.3 inches
C) 59 feet 2.7 inches
D) 56 feet 10.9 inches
loading answer...
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score