Deck : Deck General - 4232/5076 |
---|
« Previous Question |
The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft? |
A) 60 feet 9.6 inches |
B) 59 feet 9.3 inches |
C) 59 feet 2.7 inches |
D) 56 feet 10.9 inches |
loading answer...
Comments |
---|
There are no comments for this question. |