The DEEP DRILLER, while loaded as shown in the Sample Load Form #4 (Drilling), suffers damage to the starboard center column below the waterline. Pumping from tanks 2S and 9S is not sufficient to prevent increasing starboard list. You should consider counterflooding in tank __________. |
A) C2BP |
B) 9P |
C) C2BS |
D) 2P |